How to Send a Drawing for a 24–48 Hour Engineering Quote

A fast quote depends on a complete drawing package. Precimora quotes custom precision parts built to the customer's drawing, with a reply promised in 24–48 hours. That timeline is realistic when the RFQ already contains the information an engineer needs to price the part, and it slips when key details have to be chased afterwards.

A fast quote depends on a complete drawing package. Precimora quotes custom precision parts built to the customer’s drawing, with a reply promised in 24–48 hours. That timeline is realistic when the RFQ already contains the information an engineer needs to price the part, and it slips when key details have to be chased afterwards.

Send the drawing in a format the shop can open and measure. STEP, PDF, and DWG files are accepted, and DXF, IGES, and ZIP packages can also be sent. A STEP file is usually the most useful for a turned part because it carries the geometry directly; a PDF is useful as a readable reference for dimensions, notes, and tolerances. Sending both, where possible, removes ambiguity about which file governs.

Dimensioned technical drawing of a machined part
A dimensioned technical drawing. The drawing package should describe the finished part, not just its outline.

Alongside the drawing, state the material, quantity, and annual volume. Precimora works in brass, copper, and stainless steel, and material choice changes machining time and cost, so a part quoted in brass cannot simply be repriced in stainless steel without a new check. Quantity matters for the same reason: a prototype quantity and a production quantity are priced differently, and annual volume tells the shop whether repeat tooling or planning is worth discussing.

Custom parts in a machining workshop
A custom-parts workshop scene. Material choice is part of the quote, so name it in the RFQ rather than leaving it to assumption.

Tolerance, surface finish, and process should be stated explicitly, not left to assumption. If a dimension is critical, mark it. If a surface must be smooth for sealing or appearance, say so. If you already know the process — CNC turning, Swiss turning, precision turning, or a secondary operation — name it; if you do not, say what the part must do and let the engineering review suggest the process. Precimora reviews manufacturability before quoting, so a drawing that invites a check is a drawing that is easier to quote accurately.

Finally, add the practical details: part name, target delivery date, and whether you need inspection documentation or an NDA before quoting. Those details do not change the geometry, but they change how the quote is prepared, and they prevent a technically correct quote from being unusable for the project it was meant to serve.

RFQ checklist

  • Drawing file: STEP plus PDF where possible
  • Material: brass, copper, or stainless steel
  • Quantity and annual volume
  • Tolerances and surface finish, with critical dimensions marked
  • Process, if known, or the part’s function if not
  • Target delivery date and any inspection or NDA requirement

Send that package and the 24–48 hour quote can be based on the real part, not on a follow-up round of questions.

What a complete drawing package contains

A complete package answers the questions an engineer would otherwise have to ask. It starts with the geometry itself: the views needed to understand the shape, every dimension needed to make it, and a clear statement of which file governs if the model and the PDF differ. Add the drawing revision, so both sides know they are quoting the same version, and keep any superseded version out of the package. Notes on the drawing should cover material, finish, and any feature that is not obvious from the shape alone, such as a thread, a bore that must stay clean, or a surface that mates with another part.

Context matters as much as geometry. State what the part does, what it fits against, and which features affect fit or function. A dimension that controls assembly deserves to be identified as critical; a dimension that only sets overall size can be treated differently. The same applies to finish: a sealing face, a bearing surface, and a visible outer surface do not need the same treatment, and naming the purpose of each surface helps the reviewer judge what is really required rather than guessing from appearance.

How to specify tolerance and inspection without over-specifying

Tightening every dimension is one of the most common reasons a quote rises and a part becomes harder to make. A better approach is to separate critical dimensions from the rest. Mark the dimensions that affect fit, function, sealing, or safety, and leave ordinary dimensions at the general level shown on the drawing. If a feature must be checked in a particular way, say so at RFQ stage, and state whether inspection documentation is required. That way the quote covers the checking you actually need, rather than adding inspection effort you did not ask for or omitting documentation you expected.

Also state what should happen when a dimension is unclear. If a tolerance is missing, or if two dimensions conflict, the engineer needs to know whether to ask, to follow the model, or to follow the PDF. Naming the governing document in advance avoids a part made to the wrong interpretation. Where a mating part already exists, sending its relevant dimensions, or at least describing the mating condition, is more useful than a general note asking for a good fit.

Cost drivers to check before you send the RFQ

Price is driven less by any single feature than by the combination of material, complexity, quantity, and checking. Material choice affects machining time and cost, as the original guidance notes. Complexity matters too: additional operations, internal features, threads, and tight control on selected surfaces each add steps, and steps add time. Quantity changes the balance again, because setup and planning are spread across more parts in a larger run, while a small prototype run carries the same preparation for fewer pieces.

Before sending, it is worth asking whether every requirement earns its cost. Can a non-critical feature be simplified without changing function? Is a secondary operation truly needed, or does it only duplicate something the turning process already achieves? Is the inspection documentation proportionate to the risk? None of these questions requires changing the design on the spot; they simply help the quote reflect the part you actually need, and they give the engineer a clearer basis for suggesting a more manufacturable alternative where one exists.

Common pitfalls, and a final check before sending

The most frequent pitfalls are easy to avoid once they are named. Sending only a screenshot or a photo of a drawing, without a measurable file, forces the engineer to guess. Sending an old revision alongside a new one creates doubt about which version to price. Leaving material, quantity, or finish blank invites an assumption that may not match the intended part. And asking for a quote on a part whose mating condition is unknown can produce a part that measures correctly on its own yet does not assemble as intended.

Complex 5-axis machined impeller
A complex 5-axis impeller part. State inspection and documentation needs in the RFQ, so the quote covers what you will ask for on delivery.

Run a short final check: is the governing file identified, is the revision current, are critical dimensions marked, is material and quantity stated, and are inspection and delivery expectations included? If the answer to each question is yes, the package is ready to send, and the engineering review can focus on manufacturability and price rather than on missing information.

Request an engineering quote — https://precimora.com/request-a-quote/ — upload your drawing and include material, quantity, and tolerance.

Drawing-led production

Have a part ready for production?

Send your drawing and requirements for engineering review.

Upload DrawingTalk to an Engineer
WhatsApp