Skip to content

PRECIMORA / Quality

Quality You Can Verify

Inspection and documentation are configured around the part and published only when verified.

  • Incoming material inspection
  • First article inspection
  • In-process inspection
  • Final inspection
  • Documentation
  • Traceability

Before production

Requirements are agreed first.

Material, critical dimensions, finish, quantity and report requirements are reviewed against the drawing before the production route is confirmed.

During production

Checks follow the part.

Inspection checkpoints can be placed around first article, in-process and final features, with records organized around the approved requirement.

At shipment

Documentation stays useful.

Identification, packing and inspection records are prepared according to the project scope and delivery requirements.

Drawing-led production

Have a part ready for production?

Send your drawing and requirements for engineering review.

Upload DrawingTalk to an Engineer
WhatsApp