Brass turned parts are often ordered by a familiar name, but the name alone does not define the part. A nut, a bushing, and a standoff do different jobs, and each one needs a different set of dimensions in the RFQ. Specifying the job first, and the dimensions second, avoids a part that fits the description but fails in assembly.
A brass nut is a fastening part. The critical specification is the thread: thread size, pitch, and whether the nut must match a specific bolt or stud. Length and across-flats size matter for wrenching and clearance, and a flanged nut adds a bearing face that changes both. If the nut must resist loosening or sit in a confined space, say so, because that affects the form that should be quoted.

A brass bushing is a bearing and spacing part. The critical dimensions are bore, outside diameter, and length, plus the clearance the shaft needs inside the bore. A bushing that is too tight will bind; one that is too loose will rattle and wear. State the shaft size, the housing size, and whether the bushing must be pressed in, slip in, or rotate. Sleeves and spacers fall in the same family: they set distance and alignment, so their length and bore are usually more important than their outside appearance.

A standoff, including a hex standoff, holds two parts apart at a distance. The critical dimensions are the standoff length, the thread at each end, and whether each end is threaded internally, externally, or both. A standoff quoted with only one thread specified will be quoted twice, once correctly and once after correction. State both ends, the distance to be held, and whether the standoff must also carry a load or simply position a board or panel.

For any of the three, a drawing that states material, tolerances, finish, and quantity is the fastest route to a usable quote.
How to write a specification that covers material, process, tolerance and inspection
Start with function, then add the four specification layers. Material comes first in practice, because brass is the family named here, but the form of the part still needs to be stated: is it a solid turned part, or does it need a secondary operation such as a cross-hole or a particular finish? Next, separate the dimensions that control function from those that only set size. For a nut, that is the thread and the mating condition; for a bushing, the bore and its clearance; for a standoff, both end threads and the held distance. Mark those dimensions as critical on the drawing, and leave the rest at the general level shown there.
Inspection should be agreed at RFQ stage, not discovered at delivery. State which dimensions must be checked, whether a thread must be checked against its mating part, and whether inspection documentation is required. A bushing whose bore is checked against a gauge, and a standoff whose length is checked against the assembly it holds apart, are both easier to judge than parts checked only by eye. If a sample is needed before a repeat run, say so before quoting, so the sample and the production parts are judged by the same drawing revision.
Choosing between a nut, a bushing and a standoff, and DFM checks
The choice follows the job, not the shape. If the part must join two threaded members, it is a nut problem, and the thread and wrenching size lead the specification. If it must guide or support a shaft, it is a bushing problem, and bore clearance and length lead. If it must hold a gap, it is a standoff problem, and length and both end threads lead. Naming the wrong family is a common source of rework: a spacer quoted as a nut, for example, may arrive with a thread nobody needed and a length nobody checked.
Run manufacturability checks before sending the drawing. Is there enough wall left around a bore or a thread for the part to hold its shape in use? Does a flange or a hex face leave room for the tool and for wrenching? Can the thread be formed cleanly at both ends of a standoff, or does one end need a different approach? Is there a sharp edge that should be broken for handling, or an edge that must stay sharp for location? These checks do not require changing the design on the spot; they give the engineering review a clear basis for confirming the part or suggesting a simpler form that still does the job.
Cost drivers, and common pitfalls to avoid
Cost follows complexity, quantity and checking, not the name of the part. Additional operations, a second thread form, tight control on a bore or on a held distance, and inspection documentation each add steps. Quantity changes the balance, because preparation is spread across more parts in a larger run. Before quoting, ask whether every feature earns its cost: a decorative finish on a hidden bushing, or a tight dimension on a non-critical outside diameter, may add cost without improving function.
The pitfalls are consistent across all three families. Specifying only one end of a standoff, stating a nut without its mating bolt, or giving a bushing bore without the shaft and housing sizes, each forces an assumption that can be wrong. Sending a description without a drawing has the same effect, as does mixing revisions. A short final checklist prevents most of it: job named, critical dimensions marked, both ends of a standoff stated, shaft and housing sizes given for a bushing, mating thread stated for a nut, material, quantity and inspection needs included.
Request a quote for brass nuts — https://precimora.com/products/brass-nuts/ — and include thread, bore, and length for each part you need.