
Secondary operations such as deburring, threading, cross-holes, finishing and assembly-related preparation are reviewed as part of the drawing package. The exact sequence and inspection requirements are confirmed for each component and production stage.
Share the drawing, material, quantity and target timing so the engineering review can define the required process route.